Artemis II Crew with EGS. Artemis II NASA astronaut Christina Koch greets Exploration Ground Systems team members inside the transfer aisle of the Vehicle Assembly Building during a visit to the agency’s Kennedy Space Center in Florida on Aug. 7, 2023. The approximately 10-day Artemis II flight will test NASA’s foundational human deep space exploration capabilities, the Space Launch System rocket and Orion spacecraft, for the first time with astronauts and will pave the way for lunar surface missions, including landing the first woman and the first person of color on the Moon.

Artemis II Crew with EGS. Artemis II NASA astronaut Christina Koch greets Exploration Ground Systems team members inside the transfer aisle of the Vehicle Assembly Building during a visit to the agency’s Kennedy Space Center in Florida on Aug. 7, 2023. The approximately 10-day Artemis II flight will test NASA’s foundational human deep space exploration capabilities, the Space Launch System rocket and Orion spacecraft, for the first time with astronauts and will pave the way for lunar surface missions, including landing the first woman and the first person of color on the Moon. Stock Photo
Preview

Image details

Contributor:

NASA/piemags / Alamy Stock Photo

Image ID:

2T2ATBY

File size:

86.1 MB (4 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

6720 x 4480 px | 56.9 x 37.9 cm | 22.4 x 14.9 inches | 300dpi

Date taken:

7 August 2023

More information:

This image is a public domain image, which means either that copyright has expired in the image or the copyright holder has waived their copyright. Alamy charges you a fee for access to the high resolution copy of the image.

This image could have imperfections as it’s either historical or reportage.