Split, Croatia. 27th May, 2024. The new road bridge over the Cetina river in Omiš, south of Split, is now complete and opened for traffic on 27. May 2024. The bridge, linking the two tunnels of Omiš and Komorjak is 224, 45meters long and construction is worth 23, 16 million euros. Photo: Zvonimir Barisin/PIXSELL Credit: Pixsell/Alamy Live News

Split, Croatia. 27th May, 2024. The new road bridge over the Cetina river in Omiš, south of Split, is now complete and opened for traffic on 27. May 2024. The bridge, linking the two tunnels of Omiš and Komorjak is 224, 45meters long and construction is worth 23, 16 million euros. Photo: Zvonimir Barisin/PIXSELL Credit: Pixsell/Alamy Live News Stock Photo
Preview

Image details

Contributor:

Pixsell / Alamy Stock Photo

Image ID:

2X8RMT0

File size:

30.5 MB (2.5 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

4000 x 2667 px | 33.9 x 22.6 cm | 13.3 x 8.9 inches | 300dpi

Date taken:

27 May 2024

More information:

This image could have imperfections as it’s either historical or reportage.

Available for Editorial use only.

Search stock photos by tags