Split, Croatia. 27th May, 2024. The new road bridge over the Cetina river in Omiš, south of Split, is now complete and opened for traffic on 27. May 2024. The bridge, linking the two tunnels of Omiš and Komorjak is 224, 45meters long and construction is worth 23, 16 million euros. Photo: Zvonimir Barisin/PIXSELL Credit: Pixsell/Alamy Live News
RMID:Image ID:2X8RMT0
Image details
Contributor:
Pixsell / Alamy Stock PhotoImage ID:
2X8RMT0File size:
30.5 MB (2.5 MB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
4000 x 2667 px | 33.9 x 22.6 cm | 13.3 x 8.9 inches | 300dpiDate taken:
27 May 2024Photographer:
Pixsell photo & video agencyMore information:
This image could have imperfections as it’s either historical or reportage.