221001 -- LHASA, Oct. 1, 2022 -- Photo taken on Oct. 29, 2015 shows the tunnel boring machine TBM being completed for the construction of Doxong Pass tunnel on the highway linking Pad Township in the city of Nyingchi and Medog County, southwest China s Tibet Autonomous Region. The 67.22-km road connects Pad Township in the city of Nyingchi and Medog County. It is the second passageway to Medog, following the first one connecting the county and Zhamog Township, Bomi County. After the new highway opens to traffic, the length of the road connecting the city proper of Nyingchi and Medog County wil
Image details
Contributor:
Imago / Alamy Stock PhotoImage ID:
2RRM51NFile size:
22.9 MB (925.4 KB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
3268 x 2451 px | 27.7 x 20.8 cm | 10.9 x 8.2 inches | 300dpiDate taken:
1 October 2022Photographer:
IMAGO/Dong ZhixiongMore information:
This image could have imperfections as it’s either historical or reportage.
221001 -- LHASA, Oct. 1, 2022 -- Photo taken on Oct. 29, 2015 shows the tunnel boring machine TBM being completed for the construction of Doxong Pass tunnel on the highway linking Pad Township in the city of Nyingchi and Medog County, southwest China s Tibet Autonomous Region. The 67.22-km road connects Pad Township in the city of Nyingchi and Medog County. It is the second passageway to Medog, following the first one connecting the county and Zhamog Township, Bomi County. After the new highway opens to traffic, the length of the road connecting the city proper of Nyingchi and Medog County will be shortened to 180 km from 346 km, cutting travel time to four hours. Photo by /Xinhua CHINA-TIBET-PAD-MEDOG HIGHWAY-CONSTRUCTION CN Dong PUBLICATIONxNOTxINxCHN