Manufacturing production line for the new Boeing 787-10 Dreamliner aircraft unveiled at the Boeing factory February 17, 2016 in North Charleston, SC. President Donald Trump attended the rollout ceremony for the stretch version of the aircraft capable of carrying 330 passengers over 7,000 nautical miles.

Manufacturing production line for the new Boeing 787-10 Dreamliner aircraft unveiled at the Boeing factory February 17, 2016 in North Charleston, SC. President Donald Trump attended the rollout ceremony for the stretch version of the aircraft capable of carrying 330 passengers over 7,000 nautical miles. Stock Photo
Preview

Image details

Contributor:

Richard Ellis / Alamy Stock Photo

Image ID:

HR1NKJ

File size:

50.6 MB (2.4 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

5150 x 3433 px | 43.6 x 29.1 cm | 17.2 x 11.4 inches | 300dpi

Date taken:

23 February 2017

Location:

North Charleston, SC

More information:

This image could have imperfections as it’s either historical or reportage.

Manufacturing production line for the new Boeing 787-10 Dreamliner aircraft unveiled at the Boeing factory February 17, 2016 in North Charleston, SC. President Donald Trump attended the rollout ceremony for the stretch version of the aircraft capable of carrying 330 passengers over 7, 000 nautical miles.