Beginning operations in the Brett gravel pit. A 5-yard electric shovel dumping into a feeder hopper mounted on the end of a 200-ft. traveling boom conveyor which in turn feeds a 60-inch pit conveyor, discharging to the raw stockpile below.; Scope and content: Photograph from Volume Two of a series of photo albums documenting the construction of the Grand Coulee Dam and related work on the Columbia Basin Project.

Beginning operations in the Brett gravel pit. A 5-yard electric shovel dumping into a feeder hopper mounted on the end of a 200-ft. traveling boom conveyor which in turn feeds a 60-inch pit conveyor, discharging to the raw stockpile below.; Scope and content:  Photograph from Volume Two of a series of photo albums documenting the construction of the Grand Coulee Dam and related work on the Columbia Basin Project. Stock Photo
Preview

Image details

Contributor:

Tango Images / Alamy Stock Photo

Image ID:

TXXAWH

File size:

71.5 MB (2.3 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

6142 x 4070 px | 52 x 34.5 cm | 20.5 x 13.6 inches | 300dpi

More information:

This image is a public domain image, which means either that copyright has expired in the image or the copyright holder has waived their copyright. Alamy charges you a fee for access to the high resolution copy of the image.

This image could have imperfections as it’s either historical or reportage.