Berlin, Germany. 14th Mar, 2023. A construction worker works on a wall at the construction site during renovation work at the GDR Museum. Three months after the aquarium burst in a Berlin hotel, the GDR Museum, which was also affected, is about to reopen. (to dpa-Korr: "New concept after aquarium disaster - DDR Museum reopens") Credit: Carsten Koall/dpa/Alamy Live News

Berlin, Germany. 14th Mar, 2023. A construction worker works on a wall at the construction site during renovation work at the GDR Museum. Three months after the aquarium burst in a Berlin hotel, the GDR Museum, which was also affected, is about to reopen. (to dpa-Korr: "New concept after aquarium disaster - DDR Museum reopens") Credit: Carsten Koall/dpa/Alamy Live News Stock Photo
Preview

Image details

Contributor:

dpa picture alliance / Alamy Stock Photo

Image ID:

2PDJ5G8

File size:

38.6 MB (1.4 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

4500 x 3002 px | 38.1 x 25.4 cm | 15 x 10 inches | 300dpi

Date taken:

14 March 2023

Photographer:

dpa

More information:

This image could have imperfections as it’s either historical or reportage.

Available for Editorial use only.