Biloxi, MS, May 6, 2015 - Construction workers from Oscar Renda Contracting finish concrete preparation for curb and gutter replacement after the installation of new water and sewer lines under 8th Street in Biloxi, MS. The restoration of Biloxi's water and sewer infrastructure is Mississippi's largest FEMA Public Assistance project related to the Hurricane Katrina recovery effort.

Biloxi, MS, May 6, 2015 - Construction workers from Oscar Renda Contracting finish concrete preparation for curb and gutter replacement after the installation of new water and sewer lines under 8th Street in Biloxi, MS. The restoration of Biloxi's water and sewer infrastructure is Mississippi's largest FEMA Public Assistance project related to the Hurricane Katrina recovery effort. Stock Photo
Preview

Image details

Contributor:

NB/FEMA / Alamy Stock Photo

Image ID:

2KYGDJK

File size:

56.5 MB (2.5 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

5445 x 3630 px | 46.1 x 30.7 cm | 18.2 x 12.1 inches | 300dpi

Date taken:

6 May 2015

More information:

This image is a public domain image, which means either that copyright has expired in the image or the copyright holder has waived their copyright. Alamy charges you a fee for access to the high resolution copy of the image.

This image could have imperfections as it’s either historical or reportage.