BUILDING A CLASS 40 FLOATING BAILEY BRIDGE OVER THE SEINE - Two pontoon sections being towed to connect to landing bay British Army, 21st Army Group

BUILDING A CLASS 40 FLOATING BAILEY BRIDGE OVER THE SEINE - Two pontoon sections being towed to connect to landing bay British Army, 21st Army Group Stock Photo
Preview

Image details

Contributor:

piemags/ww2archive / Alamy Stock Photo

Image ID:

2X2FWWA

File size:

14.3 MB (313.8 KB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

2659 x 1879 px | 22.5 x 15.9 cm | 8.9 x 6.3 inches | 300dpi

More information:

This image could have imperfections as it’s either historical or reportage.