Construction of a 400,000 gallon water tank for the Mars Hospital Project in Mers-sur-Alliers, Nievre, France. This photograph was taken on October 20, 1918 by Pvt. Campbell, S. C. It depicts a detachment of the 521st Engineers working on the water tank. The image was passed by A.F.P. censor, although the exact date is not mentioned.
RMID:Image ID:2RCFAWY
Image details
Contributor:
piemags/NSC / Alamy Stock PhotoImage ID:
2RCFAWYFile size:
136.8 MB (3.9 MB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
8404 x 5688 px | 71.2 x 48.2 cm | 28 x 19 inches | 300dpiDate taken:
24 February 2017More information:
This image is a public domain image, which means either that copyright has expired in the image or the copyright holder has waived their copyright. Alamy charges you a fee for access to the high resolution copy of the image.
This image could have imperfections as it’s either historical or reportage.