Danube power station Ybbs-Persenbeug, building site: first placing of concrete at the future shipping pier at north bank of the air lock, 14.01.1955 - 19550114 PD0002 - Rechteinfo: Rights Managed (RM)
RMID:Image ID:2X1B0T4
Image details
Contributor:
APA-PictureDesk / Alamy Stock PhotoImage ID:
2X1B0T4File size:
70.5 MB (3.1 MB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
5600 x 4400 px | 47.4 x 37.3 cm | 18.7 x 14.7 inches | 300dpiDate taken:
14 January 1955Photographer:
APA-PictureDeskMore information:
This image could have imperfections as it’s either historical or reportage.