Ely, Nevada, USA. 26th Feb, 2021. Windmills are seen at Spring Valley Wind, Nevada's first wind farm on February 26, 2021. The farm is owned and operated by Pattern Energy. The facility is located in Spring Valley, northwest of Great Basin National Park and approximately 30 miles east of Ely, Nevada. The 152 megawatt project, built in 2012, uses 66 Siemens SWT-2.3-101 wind turbines and connects to the NV Energy transmission system. Credit: David Becker/ZUMA Wire/Alamy Live News

Ely, Nevada, USA. 26th Feb, 2021. Windmills are seen at Spring Valley Wind, Nevada's first wind farm on February 26, 2021. The farm is owned and operated by Pattern Energy. The facility is located in Spring Valley, northwest of Great Basin National Park and approximately 30 miles east of Ely, Nevada. The 152 megawatt project, built in 2012, uses 66 Siemens SWT-2.3-101 wind turbines and connects to the NV Energy transmission system. Credit: David Becker/ZUMA Wire/Alamy Live News Stock Photo
Preview

Image details

Contributor:

ZUMA Press, Inc. / Alamy Stock Photo

Image ID:

2ER6X73

File size:

33.6 MB (726 KB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

2941 x 3988 px | 24.9 x 33.8 cm | 9.8 x 13.3 inches | 300dpi

Date taken:

26 February 2021

Photographer:

ZUMA Press

More information:

This image could have imperfections as it’s either historical or reportage.

Available for Editorial use only.