Hamburg, Germany. 24th Mar, 2023. Due to a closure of the A7 freeway for bridge demolition work, no vehicles are on the road between the Heimfeld and Volkspark junctions. As planned, the Autobahn 7 has been fully closed in both directions for the entire weekend. Credit: Markus Scholz/dpa/Alamy Live News

Hamburg, Germany. 24th Mar, 2023. Due to a closure of the A7 freeway for bridge demolition work, no vehicles are on the road between the Heimfeld and Volkspark junctions. As planned, the Autobahn 7 has been fully closed in both directions for the entire weekend. Credit: Markus Scholz/dpa/Alamy Live News Stock Photo
Preview

Image details

Contributor:

dpa picture alliance / Alamy Stock Photo

Image ID:

2PGXNB8

File size:

58.8 MB (3 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

6000 x 3424 px | 50.8 x 29 cm | 20 x 11.4 inches | 300dpi

Date taken:

24 March 2023

Photographer:

dpa

More information:

This image could have imperfections as it’s either historical or reportage.

Available for Editorial use only.

Search stock photos by tags