Kiel, Germany. 16th June, 2021. Thick cables and plugs form the interface to cruise ships at the newly commissioned shore power system. The plant will supply both cruise ships at the Baltic quay and Stena Line ferries at the Swedish quay with climate-neutral green electricity. Credit: Axel Heimken/dpa/Alamy Live News
RMID:Image ID:2G3FD8E
Image details
Contributor:
dpa picture alliance / Alamy Stock PhotoImage ID:
2G3FD8EFile size:
59.6 MB (1.8 MB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
5693 x 3659 px | 48.2 x 31 cm | 19 x 12.2 inches | 300dpiDate taken:
16 June 2021Photographer:
dpaMore information:
This image could have imperfections as it’s either historical or reportage.