Meppen, Germany. 23rd Oct, 2023. Hans-Jürgen Brick (CEO Amprion) stands on the podium before the official groundbreaking ceremony for the construction of the A-Nord underground cable route. The new, 300 km long route will transport two gigawatts of wind power from Emden in East Frisia to Meerbusch-Osterath in North Rhine-Westphalia. It can meet the energy needs of around two million people. Credit: Friso Gentsch/dpa/Alamy Live News

Meppen, Germany. 23rd Oct, 2023. Hans-Jürgen Brick (CEO Amprion) stands on the podium before the official groundbreaking ceremony for the construction of the A-Nord underground cable route. The new, 300 km long route will transport two gigawatts of wind power from Emden in East Frisia to Meerbusch-Osterath in North Rhine-Westphalia. It can meet the energy needs of around two million people. Credit: Friso Gentsch/dpa/Alamy Live News Stock Photo
Preview

Image details

Contributor:

dpa picture alliance / Alamy Stock Photo

Image ID:

2T356B5

File size:

13.7 MB (464.5 KB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

1946 x 2461 px | 33 x 41.7 cm | 13 x 16.4 inches | 150dpi

Date taken:

23 October 2023

Photographer:

dpa

More information:

This image could have imperfections as it’s either historical or reportage.

Available for Editorial use only.

Search stock photos by tags