NASA's SLS Booster rolls back to the Vehicle Assembly Building at the Kennedy Space Center, Florida on Tuesday, April 26, 2022. NASA plans to conduct repairs to the rocket and its mobile launch platform before returning to the pad for a wet dress rehearsal and tanking test. Photo by Joe Marino/UPI

NASA's SLS Booster rolls back to the Vehicle Assembly Building at the Kennedy Space Center, Florida on Tuesday, April 26, 2022. NASA plans to conduct repairs to the rocket and its mobile launch platform before returning to the pad for a wet dress rehearsal and tanking test.     Photo by Joe Marino/UPI Stock Photo
Preview

Image details

Contributor:

UPI / Alamy Stock Photo

Image ID:

2J5WWH8

File size:

36.6 MB (1.2 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

4000 x 3200 px | 33.9 x 27.1 cm | 13.3 x 10.7 inches | 300dpi

Date taken:

26 April 2022

Photographer:

UPI

More information:

This image could have imperfections as it’s either historical or reportage.

Available for Editorial use only.