Preparations for the installation of the last segment of the steel span structure of the Ston bridge as part of The South Dalmatia Road Connectivity project, on March 15, 2022, in Broce, near Ston, Croatia. The project consists of the construction of a 32.5 km alternative road entirely within Croatia to bypass the two border crossings with Bosnia and Herzegovina (BiH) to cross the BiH Neum coastal land strip. The project includes the 2.4 km long Peljesac bridge and also 12 km of access roads, the improvement of 10.2 km of the existing D414 road and the construction of a 7.9 km bypass around th
Image details
Contributor:
Pixsell / Alamy Stock PhotoImage ID:
2KXYMBKFile size:
30.5 MB (1.3 MB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
4000 x 2667 px | 33.9 x 22.6 cm | 13.3 x 8.9 inches | 300dpiDate taken:
15 March 2022Photographer:
Grgo Jelavic/PIXSELLMore information:
This image could have imperfections as it’s either historical or reportage.
Preparations for the installation of the last segment of the steel span structure of the Ston bridge as part of The South Dalmatia Road Connectivity project, on March 15, 2022, in Broce, near Ston, Croatia. The project consists of the construction of a 32.5 km alternative road entirely within Croatia to bypass the two border crossings with Bosnia and Herzegovina (BiH) to cross the BiH Neum coastal land strip. The project includes the 2.4 km long Peljesac bridge and also 12 km of access roads, the improvement of 10.2 km of the existing D414 road and the construction of a 7.9 km bypass around the village of Ston. Photo: Grgo Jelavic/PIXSELL