Several remote cameras are positioned around the perimeter of Launch Pad 39B in preparation for the launch of mission STS-115 aboard Space Shuttle Atlantis. A lightning strike to the pad's lightning protection system on August 25, caused the mission management team to postpone the launch of mission STS-115 for 24 hours in order to review all electrical systems on the space shuttle and ground support equipment at the pad. (UPI Photo/NASA/Ken Thornsley)

Several remote cameras are positioned around the perimeter of Launch Pad 39B in preparation for the launch of mission STS-115 aboard Space Shuttle Atlantis. A lightning strike to the pad's lightning protection system on August 25, caused the mission management team to postpone the launch of mission STS-115 for 24 hours in order to review all electrical systems on the space shuttle and ground support equipment at the pad. (UPI Photo/NASA/Ken Thornsley) Stock Photo
Preview

Image details

Contributor:

UPI / Alamy Stock Photo

Image ID:

W0M9HD

File size:

17.1 MB (466.2 KB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

3000 x 1993 px | 25.4 x 16.9 cm | 10 x 6.6 inches | 300dpi

Date taken:

26 August 2006

Photographer:

KEN THORNSLEY

More information:

This image could have imperfections as it’s either historical or reportage.

Available for Editorial use only.