Aug 29, 2006; Oakland, CA, USA; A 1750 ton steel box girder bridge segment is slowly raised toward its connection to the west-bound Skyway section of the new Bay Bridge during an 40-hour project Tuesday, August 29, 2006 in Oakland, Calif. The segment will connect the Skyway to the self-anchored Suspension span on the bridge. Mandatory Credit: Photo by Bob PeppingContra Costa Times

Aug 29, 2006; Oakland, CA, USA; A 1750 ton steel box girder bridge segment is slowly raised toward its connection to the west-bound Skyway section of the new Bay Bridge during an 40-hour project Tuesday, August 29, 2006 in Oakland, Calif.  The segment will connect the Skyway to the self-anchored Suspension span on the bridge. Mandatory Credit: Photo by Bob PeppingContra Costa Times Stock Photo
Preview

Image details

Contributor:

ZUMA Press, Inc. / Alamy Stock Photo

Image ID:

DP5306

File size:

11.5 MB (627.6 KB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

2464 x 1632 px | 41.7 x 27.6 cm | 16.4 x 10.9 inches | 150dpi

Date taken:

29 August 2006

Photographer:

ZUMA

More information:

This image could have imperfections as it’s either historical or reportage.

Available for Editorial use only.