December 20, 2006 , San Diego,-Work is underway on the San Diego River section in Lakeside as part of a $16 million plan to restore natural habitat and make a river park. A constructed wetland pond where the Los Coches creek comes in to the San Diego River is being constructed as part of the proj
RMID:Image ID:CFTA91
Image details
Contributor:
ZUMA Press, Inc. / Alamy Stock PhotoImage ID:
CFTA91File size:
23.4 MB (876.2 KB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
3504 x 2336 px | 29.7 x 19.8 cm | 11.7 x 7.8 inches | 300dpiDate taken:
21 December 2006Photographer:
ZUMAMore information:
This image could have imperfections as it’s either historical or reportage.
December 20, 2006 , San Diego, -Work is underway on the San Diego River section in Lakeside as part of a $16 million plan to restore natural habitat and make a river park. A constructed wetland pond where the Los Coches creek comes in to the San Diego River is being constructed as part of the project. Mandatory Credit: Photo by John Gibbins/San Diego Union-Tribune/Zuma Press copyright 2006 San Diego Union-Tribune