AUGUST OFFER, SAVE UP TO 30% ON YOUR FIRST ORDER, APPLY CODE: 30%OFFAUGUST

Wind turbines being prepared for the Walney offshore wind farm at Mostyn Port by Siemens.

Wind turbines being prepared for the Walney offshore wind farm at Mostyn Port by Siemens. Stock Photo
Preview

Image details

Contributor:

Global Warming Images / Alamy Stock Photo

Image ID:

BNHPPB

File size:

60.2 MB (1.9 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

5616 x 3744 px | 47.5 x 31.7 cm | 18.7 x 12.5 inches | 300dpi

Date taken:

17 July 2010

Photographer:

Ashley Cooper

More information:

The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria. The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 3.6 MW turbines, giving a total capacity of the Walney project of 367.2 MW, enough to power 320, 000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.