Sola 1949: Sola Airport is expanded. Total construction costs about NOK 8 million. Inside the mixer, the mixers are fed with huge amounts of cement. Day consumption is 2400 bags. The two new runways will devour a total of 300,000 bags. Photo: Sverre A. Børretzen / Current / NTB Stock Photohttps://www.alamy.com/licenses-and-pricing/?v=1https://www.alamy.com/sola-1949-sola-airport-is-expanded-total-construction-costs-about-nok-8-million-inside-the-mixer-the-mixers-are-fed-with-huge-amounts-of-cement-day-consumption-is-2400-bags-the-two-new-runways-will-devour-a-total-of-300000-bags-photo-sverre-a-brretzen-current-ntb-image487261479.html
RM2K8MJYK–Sola 1949: Sola Airport is expanded. Total construction costs about NOK 8 million. Inside the mixer, the mixers are fed with huge amounts of cement. Day consumption is 2400 bags. The two new runways will devour a total of 300,000 bags. Photo: Sverre A. Børretzen / Current / NTB