Little Goose Dam on the Snake River in Washington, USA Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/little-goose-dam-on-the-snake-river-in-washington-usa-image427505453.html
RF2FREFFW–Little Goose Dam on the Snake River in Washington, USA
Greylag goose (Anser anser) with chicks, goslings on its back, in plumage, Flatey Island, Breidafjördur, Iceland Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-greylag-goose-anser-anser-with-chicks-goslings-on-its-back-in-plumage-90954457.html
RFF7Y99D–Greylag goose (Anser anser) with chicks, goslings on its back, in plumage, Flatey Island, Breidafjördur, Iceland
Goosander female with chicks / Common Merganser / Mergus mergan Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/goosander-female-with-chicks-common-merganser-mergus-mergan-image334614981.html
RM2ACB0R1–Goosander female with chicks / Common Merganser / Mergus mergan
Gaensesaeger, Weibchen mit Kueken, Mergus merganser, Common Merganser, female with chicks, Deutschland, Germany Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-gaensesaeger-weibchen-mit-kueken-mergus-merganser-common-merganser-37065762.html
RMC48DN6–Gaensesaeger, Weibchen mit Kueken, Mergus merganser, Common Merganser, female with chicks, Deutschland, Germany
Egyptian goose (Alopochen aegyptiacus) with chicks, foraging, Zug, Canton of Zug, Switzerland Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-egyptian-goose-alopochen-aegyptiacus-with-chicks-foraging-zug-canton-80367121.html
RFEJN129–Egyptian goose (Alopochen aegyptiacus) with chicks, foraging, Zug, Canton of Zug, Switzerland
USA, Washington State, Palouse, Whitman County. No Water No Life Snake River Expedition, Little Goose Lock and Dam, USACE hydro and run-of-the-river dam on the Snake River between Whitman and Columbia Counties (Large format sizes available) Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-usa-washington-state-palouse-whitman-county-no-water-no-life-snake-139316985.html
RMJ2JC6H–USA, Washington State, Palouse, Whitman County. No Water No Life Snake River Expedition, Little Goose Lock and Dam, USACE hydro and run-of-the-river dam on the Snake River between Whitman and Columbia Counties (Large format sizes available)
The Walla Walla District Corps of Engineers conducted an extended navigation lock maintenance outage, Dec. 12, 2016, through March 20, 2017. Little Goose dam’s navigation lock could not be returned to service by its original March 20 target because of on-site work complications which prompted the Corps to award a new contract March 10 for the completion of the remaining critical repairs on the downstream navigation lock gate. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/the-walla-walla-district-corps-of-engineers-conducted-an-extended-navigation-lock-maintenance-outage-dec-12-2016-through-march-20-2017-little-goose-dams-navigation-lock-could-not-be-returned-to-service-by-its-original-march-20-target-because-of-on-site-work-complications-which-prompted-the-corps-to-award-a-new-contract-march-10-for-the-completion-of-the-remaining-critical-repairs-on-the-downstream-navigation-lock-gate-image187347638.html
RMMTPBR2–The Walla Walla District Corps of Engineers conducted an extended navigation lock maintenance outage, Dec. 12, 2016, through March 20, 2017. Little Goose dam’s navigation lock could not be returned to service by its original March 20 target because of on-site work complications which prompted the Corps to award a new contract March 10 for the completion of the remaining critical repairs on the downstream navigation lock gate.
The Boyd Smith Mother Goose . Old King ColeWas a merry old soul. MOTHER GOOSE MELODIES 69 The first, he was a miller;The second, he was a weaver;The third, he was a tailor;And all were rogues together. The miller, he stole corn;The weaver, he stole yarn ;The little tailor stole broadcloth,To keep the three rogues warm. The miller was drownd in his dam ;The weaver was hung in his loom ;And the devil ran away with the little tailor,With the broadcloth under his arm. HUSH-a-bye, baby, on the tree top,When the wind blows, the cradle will rock;When the bough bends, the cradle will fall,Down will co Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/the-boyd-smith-mother-goose-old-king-colewas-a-merry-old-soul-mother-goose-melodies-69-the-first-he-was-a-millerthe-second-he-was-a-weaverthe-third-he-was-a-tailorand-all-were-rogues-together-the-miller-he-stole-cornthe-weaver-he-stole-yarn-the-little-tailor-stole-broadclothto-keep-the-three-rogues-warm-the-miller-was-drownd-in-his-dam-the-weaver-was-hung-in-his-loom-and-the-devil-ran-away-with-the-little-tailorwith-the-broadcloth-under-his-arm-hush-a-bye-baby-on-the-tree-topwhen-the-wind-blows-the-cradle-will-rockwhen-the-bough-bends-the-cradle-will-falldown-will-co-image343164016.html
RM2AX8D5M–The Boyd Smith Mother Goose . Old King ColeWas a merry old soul. MOTHER GOOSE MELODIES 69 The first, he was a miller;The second, he was a weaver;The third, he was a tailor;And all were rogues together. The miller, he stole corn;The weaver, he stole yarn ;The little tailor stole broadcloth,To keep the three rogues warm. The miller was drownd in his dam ;The weaver was hung in his loom ;And the devil ran away with the little tailor,With the broadcloth under his arm. HUSH-a-bye, baby, on the tree top,When the wind blows, the cradle will rock;When the bough bends, the cradle will fall,Down will co
The Walla Walla District Corps of Engineers conducted an extended navigation lock maintenance outage, Dec. 12, 2016, through March 20, 2017. Little Goose dam’s navigation lock could not be returned to service by its original March 20 target because of on-site work complications which prompted the Corps to award a new contract March 10 for the completion of the remaining critical repairs on the downstream navigation lock gate. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/the-walla-walla-district-corps-of-engineers-conducted-an-extended-navigation-lock-maintenance-outage-dec-12-2016-through-march-20-2017-little-goose-dams-navigation-lock-could-not-be-returned-to-service-by-its-original-march-20-target-because-of-on-site-work-complications-which-prompted-the-corps-to-award-a-new-contract-march-10-for-the-completion-of-the-remaining-critical-repairs-on-the-downstream-navigation-lock-gate-image230724778.html
RMRBABPJ–The Walla Walla District Corps of Engineers conducted an extended navigation lock maintenance outage, Dec. 12, 2016, through March 20, 2017. Little Goose dam’s navigation lock could not be returned to service by its original March 20 target because of on-site work complications which prompted the Corps to award a new contract March 10 for the completion of the remaining critical repairs on the downstream navigation lock gate.
Panoramic view of the Little Goose Dam on the Snake River in Washington, USA Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/panoramic-view-of-the-little-goose-dam-on-the-snake-river-in-washington-usa-image427502371.html
RF2FREBHR–Panoramic view of the Little Goose Dam on the Snake River in Washington, USA
Egyptian goose (Alopochen aegyptiacus) with chicks, swimming, Zug, Canton of Zug, Switzerland Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-egyptian-goose-alopochen-aegyptiacus-with-chicks-swimming-zug-canton-80367123.html
RFEJN12B–Egyptian goose (Alopochen aegyptiacus) with chicks, swimming, Zug, Canton of Zug, Switzerland
USA, Washington State, Palouse, Whitman County, No Water No Life, Snake River Expedition, Little Goose Lock and Dam, USACE hydro dam on the Snake River (Large format sizes available) Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-usa-washington-state-palouse-whitman-county-no-water-no-life-snake-139316450.html
RFJ2JBFE–USA, Washington State, Palouse, Whitman County, No Water No Life, Snake River Expedition, Little Goose Lock and Dam, USACE hydro dam on the Snake River (Large format sizes available)
The Walla Walla District Corps of Engineers conducted an extended navigation lock maintenance outage, Dec. 12, 2016, through March 20, 2017. Little Goose dam’s navigation lock could not be returned to service by its original March 20 target because of on-site work complications which prompted the Corps to award a new contract March 10 for the completion of the remaining critical repairs on the downstream navigation lock gate. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/the-walla-walla-district-corps-of-engineers-conducted-an-extended-navigation-lock-maintenance-outage-dec-12-2016-through-march-20-2017-little-goose-dams-navigation-lock-could-not-be-returned-to-service-by-its-original-march-20-target-because-of-on-site-work-complications-which-prompted-the-corps-to-award-a-new-contract-march-10-for-the-completion-of-the-remaining-critical-repairs-on-the-downstream-navigation-lock-gate-image187347613.html
RMMTPBP5–The Walla Walla District Corps of Engineers conducted an extended navigation lock maintenance outage, Dec. 12, 2016, through March 20, 2017. Little Goose dam’s navigation lock could not be returned to service by its original March 20 target because of on-site work complications which prompted the Corps to award a new contract March 10 for the completion of the remaining critical repairs on the downstream navigation lock gate.
. Report of the State highway commission on the Iowa lakes and lake beds . s a soft black mud, through which a pole can be pushed downfor eight or ten feet. People living in the vicinity wish to see the lake retained and makevery little complaint of any nuisance arising from its presence. Recommendations. The Commission is of the opinion that a dam should be built atthe outlet to maintain the present level. Its estimated cost is$2,000.00. GOOSE LAKE, GREENE COUNTY. Lake No. 39. Survey made by order of the Executive Council. Inspec-tion made September 26, 1916. Goose Lake includes parts of sect Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/report-of-the-state-highway-commission-on-the-iowa-lakes-and-lake-beds-s-a-soft-black-mud-through-which-a-pole-can-be-pushed-downfor-eight-or-ten-feet-people-living-in-the-vicinity-wish-to-see-the-lake-retained-and-makevery-little-complaint-of-any-nuisance-arising-from-its-presence-recommendations-the-commission-is-of-the-opinion-that-a-dam-should-be-built-atthe-outlet-to-maintain-the-present-level-its-estimated-cost-is200000-goose-lake-greene-county-lake-no-39-survey-made-by-order-of-the-executive-council-inspec-tion-made-september-26-1916-goose-lake-includes-parts-of-sect-image375033545.html
RM2CP4735–. Report of the State highway commission on the Iowa lakes and lake beds . s a soft black mud, through which a pole can be pushed downfor eight or ten feet. People living in the vicinity wish to see the lake retained and makevery little complaint of any nuisance arising from its presence. Recommendations. The Commission is of the opinion that a dam should be built atthe outlet to maintain the present level. Its estimated cost is$2,000.00. GOOSE LAKE, GREENE COUNTY. Lake No. 39. Survey made by order of the Executive Council. Inspec-tion made September 26, 1916. Goose Lake includes parts of sect
The Walla Walla District Corps of Engineers conducted an extended navigation lock maintenance outage, Dec. 12, 2016, through March 20, 2017. Little Goose dam’s navigation lock could not be returned to service by its original March 20 target because of on-site work complications which prompted the Corps to award a new contract March 10 for the completion of the remaining critical repairs on the downstream navigation lock gate. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/the-walla-walla-district-corps-of-engineers-conducted-an-extended-navigation-lock-maintenance-outage-dec-12-2016-through-march-20-2017-little-goose-dams-navigation-lock-could-not-be-returned-to-service-by-its-original-march-20-target-because-of-on-site-work-complications-which-prompted-the-corps-to-award-a-new-contract-march-10-for-the-completion-of-the-remaining-critical-repairs-on-the-downstream-navigation-lock-gate-image230724780.html
RMRBABPM–The Walla Walla District Corps of Engineers conducted an extended navigation lock maintenance outage, Dec. 12, 2016, through March 20, 2017. Little Goose dam’s navigation lock could not be returned to service by its original March 20 target because of on-site work complications which prompted the Corps to award a new contract March 10 for the completion of the remaining critical repairs on the downstream navigation lock gate.
Egyptian goose (Alopochen aegyptiacus) with chicks, swimming, Zug, Canton of Zug, Switzerland Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-egyptian-goose-alopochen-aegyptiacus-with-chicks-swimming-zug-canton-80367122.html
RFEJN12A–Egyptian goose (Alopochen aegyptiacus) with chicks, swimming, Zug, Canton of Zug, Switzerland
USA, Washington State, Palouse, Whitman County, No Water No Life, Snake River Expedition, Little Goose Lock and Dam, USACE hydro dam on the Snake River (Large format sizes available) Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-usa-washington-state-palouse-whitman-county-no-water-no-life-snake-139316449.html
RFJ2JBFD–USA, Washington State, Palouse, Whitman County, No Water No Life, Snake River Expedition, Little Goose Lock and Dam, USACE hydro dam on the Snake River (Large format sizes available)
Greylag goose (Anser anser) with chick, walking in field, Texel, North Holland, Netherlands Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-greylag-goose-anser-anser-with-chick-walking-in-field-texel-north-143780892.html
RFJ9WNYT–Greylag goose (Anser anser) with chick, walking in field, Texel, North Holland, Netherlands
The Walla Walla District Corps of Engineers conducted an extended navigation lock maintenance outage, Dec. 12, 2016, through March 20, 2017. Little Goose dam’s navigation lock could not be returned to service by its original March 20 target because of on-site work complications which prompted the Corps to award a new contract March 10 for the completion of the remaining critical repairs on the downstream navigation lock gate. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/the-walla-walla-district-corps-of-engineers-conducted-an-extended-navigation-lock-maintenance-outage-dec-12-2016-through-march-20-2017-little-goose-dams-navigation-lock-could-not-be-returned-to-service-by-its-original-march-20-target-because-of-on-site-work-complications-which-prompted-the-corps-to-award-a-new-contract-march-10-for-the-completion-of-the-remaining-critical-repairs-on-the-downstream-navigation-lock-gate-image187347615.html
RMMTPBP7–The Walla Walla District Corps of Engineers conducted an extended navigation lock maintenance outage, Dec. 12, 2016, through March 20, 2017. Little Goose dam’s navigation lock could not be returned to service by its original March 20 target because of on-site work complications which prompted the Corps to award a new contract March 10 for the completion of the remaining critical repairs on the downstream navigation lock gate.
Egyptian Goose (Alopochen aegyptiacus), adult with two chicks on a pond, North Rhine-Westphalia, Germany Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-egyptian-goose-alopochen-aegyptiacus-adult-with-two-chicks-on-a-pond-102639055.html
RFFXYH4F–Egyptian Goose (Alopochen aegyptiacus), adult with two chicks on a pond, North Rhine-Westphalia, Germany
The Walla Walla District Corps of Engineers conducted an extended navigation lock maintenance outage, Dec. 12, 2016, through March 20, 2017. Little Goose dam’s navigation lock could not be returned to service by its original March 20 target because of on-site work complications which prompted the Corps to award a new contract March 10 for the completion of the remaining critical repairs on the downstream navigation lock gate. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/the-walla-walla-district-corps-of-engineers-conducted-an-extended-navigation-lock-maintenance-outage-dec-12-2016-through-march-20-2017-little-goose-dams-navigation-lock-could-not-be-returned-to-service-by-its-original-march-20-target-because-of-on-site-work-complications-which-prompted-the-corps-to-award-a-new-contract-march-10-for-the-completion-of-the-remaining-critical-repairs-on-the-downstream-navigation-lock-gate-image230724783.html
RMRBABPR–The Walla Walla District Corps of Engineers conducted an extended navigation lock maintenance outage, Dec. 12, 2016, through March 20, 2017. Little Goose dam’s navigation lock could not be returned to service by its original March 20 target because of on-site work complications which prompted the Corps to award a new contract March 10 for the completion of the remaining critical repairs on the downstream navigation lock gate.
The Walla Walla District Corps of Engineers conducted an extended navigation lock maintenance outage, Dec. 12, 2016, through March 20, 2017. Little Goose dam’s navigation lock could not be returned to service by its original March 20 target because of on-site work complications which prompted the Corps to award a new contract March 10 for the completion of the remaining critical repairs on the downstream navigation lock gate. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/the-walla-walla-district-corps-of-engineers-conducted-an-extended-navigation-lock-maintenance-outage-dec-12-2016-through-march-20-2017-little-goose-dams-navigation-lock-could-not-be-returned-to-service-by-its-original-march-20-target-because-of-on-site-work-complications-which-prompted-the-corps-to-award-a-new-contract-march-10-for-the-completion-of-the-remaining-critical-repairs-on-the-downstream-navigation-lock-gate-image187347625.html
RMMTPBPH–The Walla Walla District Corps of Engineers conducted an extended navigation lock maintenance outage, Dec. 12, 2016, through March 20, 2017. Little Goose dam’s navigation lock could not be returned to service by its original March 20 target because of on-site work complications which prompted the Corps to award a new contract March 10 for the completion of the remaining critical repairs on the downstream navigation lock gate.
Egyptian Goose (Alopochen aegyptiacus), adult with three chicks on a pond, North Rhine-Westphalia, Germany Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-egyptian-goose-alopochen-aegyptiacus-adult-with-three-chicks-on-a-102639056.html
RFFXYH4G–Egyptian Goose (Alopochen aegyptiacus), adult with three chicks on a pond, North Rhine-Westphalia, Germany
The Walla Walla District Corps of Engineers conducted an extended navigation lock maintenance outage, Dec. 12, 2016, through March 20, 2017. Little Goose dam’s navigation lock could not be returned to service by its original March 20 target because of on-site work complications which prompted the Corps to award a new contract March 10 for the completion of the remaining critical repairs on the downstream navigation lock gate. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/the-walla-walla-district-corps-of-engineers-conducted-an-extended-navigation-lock-maintenance-outage-dec-12-2016-through-march-20-2017-little-goose-dams-navigation-lock-could-not-be-returned-to-service-by-its-original-march-20-target-because-of-on-site-work-complications-which-prompted-the-corps-to-award-a-new-contract-march-10-for-the-completion-of-the-remaining-critical-repairs-on-the-downstream-navigation-lock-gate-image230724777.html
RMRBABPH–The Walla Walla District Corps of Engineers conducted an extended navigation lock maintenance outage, Dec. 12, 2016, through March 20, 2017. Little Goose dam’s navigation lock could not be returned to service by its original March 20 target because of on-site work complications which prompted the Corps to award a new contract March 10 for the completion of the remaining critical repairs on the downstream navigation lock gate.
Greylag Goose (Anser anser) with chicks under plumage, Hamburg, Germany Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-greylag-goose-anser-anser-with-chicks-under-plumage-hamburg-germany-134684421.html
RMHR3B9W–Greylag Goose (Anser anser) with chicks under plumage, Hamburg, Germany
The Walla Walla District Corps of Engineers conducted an extended navigation lock maintenance outage, Dec. 12, 2016, through March 20, 2017. Little Goose dam’s navigation lock could not be returned to service by its original March 20 target because of on-site work complications which prompted the Corps to award a new contract March 10 for the completion of the remaining critical repairs on thnife downstream navigation lock gate. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/the-walla-walla-district-corps-of-engineers-conducted-an-extended-navigation-lock-maintenance-outage-dec-12-2016-through-march-20-2017-little-goose-dams-navigation-lock-could-not-be-returned-to-service-by-its-original-march-20-target-because-of-on-site-work-complications-which-prompted-the-corps-to-award-a-new-contract-march-10-for-the-completion-of-the-remaining-critical-repairs-on-thnife-downstream-navigation-lock-gate-image187347636.html
RMMTPBR0–The Walla Walla District Corps of Engineers conducted an extended navigation lock maintenance outage, Dec. 12, 2016, through March 20, 2017. Little Goose dam’s navigation lock could not be returned to service by its original March 20 target because of on-site work complications which prompted the Corps to award a new contract March 10 for the completion of the remaining critical repairs on thnife downstream navigation lock gate.
The Walla Walla District Corps of Engineers conducted an extended navigation lock maintenance outage, Dec. 12, 2016, through March 20, 2017. Little Goose dam’s navigation lock could not be returned to service by its original March 20 target because of on-site work complications which prompted the Corps to award a new contract March 10 for the completion of the remaining critical repairs on thnife downstream navigation lock gate. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/the-walla-walla-district-corps-of-engineers-conducted-an-extended-navigation-lock-maintenance-outage-dec-12-2016-through-march-20-2017-little-goose-dams-navigation-lock-could-not-be-returned-to-service-by-its-original-march-20-target-because-of-on-site-work-complications-which-prompted-the-corps-to-award-a-new-contract-march-10-for-the-completion-of-the-remaining-critical-repairs-on-thnife-downstream-navigation-lock-gate-image230724781.html
RMRBABPN–The Walla Walla District Corps of Engineers conducted an extended navigation lock maintenance outage, Dec. 12, 2016, through March 20, 2017. Little Goose dam’s navigation lock could not be returned to service by its original March 20 target because of on-site work complications which prompted the Corps to award a new contract March 10 for the completion of the remaining critical repairs on thnife downstream navigation lock gate.
Greylag Goose (Anser anser) with chicks in plumage, Hamburg, Germany Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-greylag-goose-anser-anser-with-chicks-in-plumage-hamburg-germany-134684425.html
RMHR3BA1–Greylag Goose (Anser anser) with chicks in plumage, Hamburg, Germany
Following an emergency outage in 2014 to repair a failing gudgeon arm, additional work was required during the FY17 outage to complete replacement of the aging components of the gate. This project involved replacement of the remaining original gudgeon arm and linkage, replacement of the pintle assembly for both gate leafs. Structural repairs included resurfacing the quoin and miter, and crack repairs to structural members. Repairs are critical to ensure reliable gate operation. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/following-an-emergency-outage-in-2014-to-repair-a-failing-gudgeon-arm-additional-work-was-required-during-the-fy17-outage-to-complete-replacement-of-the-aging-components-of-the-gate-this-project-involved-replacement-of-the-remaining-original-gudgeon-arm-and-linkage-replacement-of-the-pintle-assembly-for-both-gate-leafs-structural-repairs-included-resurfacing-the-quoin-and-miter-and-crack-repairs-to-structural-members-repairs-are-critical-to-ensure-reliable-gate-operation-image187347639.html
RMMTPBR3–Following an emergency outage in 2014 to repair a failing gudgeon arm, additional work was required during the FY17 outage to complete replacement of the aging components of the gate. This project involved replacement of the remaining original gudgeon arm and linkage, replacement of the pintle assembly for both gate leafs. Structural repairs included resurfacing the quoin and miter, and crack repairs to structural members. Repairs are critical to ensure reliable gate operation.
Following an emergency outage in 2014 to repair a failing gudgeon arm, additional work was required during the FY17 outage to complete replacement of the aging components of the gate. This project involved replacement of the remaining original gudgeon arm and linkage, replacement of the pintle assembly for both gate leafs. Structural repairs included resurfacing the quoin and miter, and crack repairs to structural members. Repairs are critical to ensure reliable gate operation. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/following-an-emergency-outage-in-2014-to-repair-a-failing-gudgeon-arm-additional-work-was-required-during-the-fy17-outage-to-complete-replacement-of-the-aging-components-of-the-gate-this-project-involved-replacement-of-the-remaining-original-gudgeon-arm-and-linkage-replacement-of-the-pintle-assembly-for-both-gate-leafs-structural-repairs-included-resurfacing-the-quoin-and-miter-and-crack-repairs-to-structural-members-repairs-are-critical-to-ensure-reliable-gate-operation-image230724784.html
RMRBABPT–Following an emergency outage in 2014 to repair a failing gudgeon arm, additional work was required during the FY17 outage to complete replacement of the aging components of the gate. This project involved replacement of the remaining original gudgeon arm and linkage, replacement of the pintle assembly for both gate leafs. Structural repairs included resurfacing the quoin and miter, and crack repairs to structural members. Repairs are critical to ensure reliable gate operation.
Greylag Goose (Anser anser) with chicks in plumage, Hamburg, Germany Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-greylag-goose-anser-anser-with-chicks-in-plumage-hamburg-germany-134684422.html
RMHR3B9X–Greylag Goose (Anser anser) with chicks in plumage, Hamburg, Germany
Greylag Goose (Anser anser) with chicks in plumage, Schleswig-Holstein, Germany Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-greylag-goose-anser-anser-with-chicks-in-plumage-schleswig-holstein-105544813.html
RMG3KYDH–Greylag Goose (Anser anser) with chicks in plumage, Schleswig-Holstein, Germany
Greylag Goose (Anser anser) with chicks in water, Nettetal, North Rhine-Westphalia, Germany Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-greylag-goose-anser-anser-with-chicks-in-water-nettetal-north-rhine-111410658.html
RFGD75C2–Greylag Goose (Anser anser) with chicks in water, Nettetal, North Rhine-Westphalia, Germany
Following an emergency outage in 2014 to repair a failing gudgeon arm, additional work was required during the FY17 outage to complete replacement of the aging components of the gate. This project involved replacement of the remaining original gudgeon arm and linkage, replacement of the pintle assembly for both gate leafs. Structural repairs included resurfacing the quoin and miter, and crack repairs to structural members. Repairs are critical to ensure reliable gate operation. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/following-an-emergency-outage-in-2014-to-repair-a-failing-gudgeon-arm-additional-work-was-required-during-the-fy17-outage-to-complete-replacement-of-the-aging-components-of-the-gate-this-project-involved-replacement-of-the-remaining-original-gudgeon-arm-and-linkage-replacement-of-the-pintle-assembly-for-both-gate-leafs-structural-repairs-included-resurfacing-the-quoin-and-miter-and-crack-repairs-to-structural-members-repairs-are-critical-to-ensure-reliable-gate-operation-image187347623.html
RMMTPBPF–Following an emergency outage in 2014 to repair a failing gudgeon arm, additional work was required during the FY17 outage to complete replacement of the aging components of the gate. This project involved replacement of the remaining original gudgeon arm and linkage, replacement of the pintle assembly for both gate leafs. Structural repairs included resurfacing the quoin and miter, and crack repairs to structural members. Repairs are critical to ensure reliable gate operation.
Following an emergency outage in 2014 to repair a failing gudgeon arm, additional work was required during the FY17 outage to complete replacement of the aging components of the gate. This project involved replacement of the remaining original gudgeon arm and linkage, replacement of the pintle assembly for both gate leafs. Structural repairs included resurfacing the quoin and miter, and crack repairs to structural members. Repairs are critical to ensure reliable gate operation. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/following-an-emergency-outage-in-2014-to-repair-a-failing-gudgeon-arm-additional-work-was-required-during-the-fy17-outage-to-complete-replacement-of-the-aging-components-of-the-gate-this-project-involved-replacement-of-the-remaining-original-gudgeon-arm-and-linkage-replacement-of-the-pintle-assembly-for-both-gate-leafs-structural-repairs-included-resurfacing-the-quoin-and-miter-and-crack-repairs-to-structural-members-repairs-are-critical-to-ensure-reliable-gate-operation-image230724782.html
RMRBABPP–Following an emergency outage in 2014 to repair a failing gudgeon arm, additional work was required during the FY17 outage to complete replacement of the aging components of the gate. This project involved replacement of the remaining original gudgeon arm and linkage, replacement of the pintle assembly for both gate leafs. Structural repairs included resurfacing the quoin and miter, and crack repairs to structural members. Repairs are critical to ensure reliable gate operation.
Greylag Goose (Anser anser) with chicks in water, Nettetal, North Rhine-Westphalia, Germany Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-greylag-goose-anser-anser-with-chicks-in-water-nettetal-north-rhine-111410657.html
RFGD75C1–Greylag Goose (Anser anser) with chicks in water, Nettetal, North Rhine-Westphalia, Germany
Canada goose (Branta canadensis) with goslings, Seilersee, Iserlohn, North Rhine-Westphalia Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-canada-goose-branta-canadensis-with-goslings-seilersee-iserlohn-north-50987083.html
RMCXXJF7–Canada goose (Branta canadensis) with goslings, Seilersee, Iserlohn, North Rhine-Westphalia
Cape Barren goose (Cereopsis novaehollandiae), Kangaroo Island, Australia Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-cape-barren-goose-cereopsis-novaehollandiae-kangaroo-island-australia-34637552.html
RFC09TFC–Cape Barren goose (Cereopsis novaehollandiae), Kangaroo Island, Australia
Greylag gooses (Anser anser) with chicks, walking in field, Texel, North Holland, Netherlands Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-greylag-gooses-anser-anser-with-chicks-walking-in-field-texel-north-143781534.html
RFJ9WPPP–Greylag gooses (Anser anser) with chicks, walking in field, Texel, North Holland, Netherlands
Following an emergency outage in 2014 to repair a failing gudgeon arm, additional work was required during the FY17 outage to complete replacement of the aging components of the gate. This project involved replacement of the remaining original gudgeon arm and linkage, replacement of the pintle assembly for both gate leafs. Structural repairs included resurfacing the quoin and miter, and crack repairs to structural members. Repairs are critical to ensure reliable gate operation. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/following-an-emergency-outage-in-2014-to-repair-a-failing-gudgeon-arm-additional-work-was-required-during-the-fy17-outage-to-complete-replacement-of-the-aging-components-of-the-gate-this-project-involved-replacement-of-the-remaining-original-gudgeon-arm-and-linkage-replacement-of-the-pintle-assembly-for-both-gate-leafs-structural-repairs-included-resurfacing-the-quoin-and-miter-and-crack-repairs-to-structural-members-repairs-are-critical-to-ensure-reliable-gate-operation-image187347637.html
RMMTPBR1–Following an emergency outage in 2014 to repair a failing gudgeon arm, additional work was required during the FY17 outage to complete replacement of the aging components of the gate. This project involved replacement of the remaining original gudgeon arm and linkage, replacement of the pintle assembly for both gate leafs. Structural repairs included resurfacing the quoin and miter, and crack repairs to structural members. Repairs are critical to ensure reliable gate operation.
Following an emergency outage in 2014 to repair a failing gudgeon arm, additional work was required during the FY17 outage to complete replacement of the aging components of the gate. This project involved replacement of the remaining original gudgeon arm and linkage, replacement of the pintle assembly for both gate leafs. Structural repairs included resurfacing the quoin and miter, and crack repairs to structural members. Repairs are critical to ensure reliable gate operation. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/following-an-emergency-outage-in-2014-to-repair-a-failing-gudgeon-arm-additional-work-was-required-during-the-fy17-outage-to-complete-replacement-of-the-aging-components-of-the-gate-this-project-involved-replacement-of-the-remaining-original-gudgeon-arm-and-linkage-replacement-of-the-pintle-assembly-for-both-gate-leafs-structural-repairs-included-resurfacing-the-quoin-and-miter-and-crack-repairs-to-structural-members-repairs-are-critical-to-ensure-reliable-gate-operation-image230724779.html
RMRBABPK–Following an emergency outage in 2014 to repair a failing gudgeon arm, additional work was required during the FY17 outage to complete replacement of the aging components of the gate. This project involved replacement of the remaining original gudgeon arm and linkage, replacement of the pintle assembly for both gate leafs. Structural repairs included resurfacing the quoin and miter, and crack repairs to structural members. Repairs are critical to ensure reliable gate operation.