Emergency telephone at night by side of M48 motorway near the Severn Bridge. Truck light trails are shown. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/stock-photo-emergency-telephone-at-night-by-side-of-m48-motorway-near-the-severn-90160712.html
RMF6K4WC–Emergency telephone at night by side of M48 motorway near the Severn Bridge. Truck light trails are shown.
View of the Severn Bridge and the River Severn at low tide from the English side. Suspension Bridge. Tolls due to end in 2018. M48 motorway Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/view-of-the-severn-bridge-and-the-river-severn-at-low-tide-from-the-english-side-suspension-bridge-tolls-due-to-end-in-2018-m48-motorway-image217628652.html
RFPJ1RFT–View of the Severn Bridge and the River Severn at low tide from the English side. Suspension Bridge. Tolls due to end in 2018. M48 motorway
Severn Bridge, M48, Aust, South Gloucestershire, 12/12/1961. Laing workers using a truck-mounted drilling rig on the temporary pontoons at the site of the foundations for the Beachley tower of the Severn Bridge. This photograph was used in the January 1962 issue of Team Spirit, the Laing company newsletter, with the caption 'Ground Engineering Limited: rock-drilling in connection with the Severn Bridge'. The contract for the construction of the foundations for the Severn Bridge was won by John Howard and Company but part of the Laing group seems to have been subcontracted for the investigation Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/severn-bridge-m48-aust-south-gloucestershire-12121961-laing-workers-using-a-truck-mounted-drilling-rig-on-the-temporary-pontoons-at-the-site-of-the-foundations-for-the-beachley-tower-of-the-severn-bridge-this-photograph-was-used-in-the-january-1962-issue-of-team-spirit-the-laing-company-newsletter-with-the-caption-ground-engineering-limited-rock-drilling-in-connection-with-the-severn-bridge-the-contract-for-the-construction-of-the-foundations-for-the-severn-bridge-was-won-by-john-howard-and-company-but-part-of-the-laing-group-seems-to-have-been-subcontracted-for-the-investigation-image462502284.html
RM2HTCPAM–Severn Bridge, M48, Aust, South Gloucestershire, 12/12/1961. Laing workers using a truck-mounted drilling rig on the temporary pontoons at the site of the foundations for the Beachley tower of the Severn Bridge. This photograph was used in the January 1962 issue of Team Spirit, the Laing company newsletter, with the caption 'Ground Engineering Limited: rock-drilling in connection with the Severn Bridge'. The contract for the construction of the foundations for the Severn Bridge was won by John Howard and Company but part of the Laing group seems to have been subcontracted for the investigation
The Severn Bridge over the River Severn between England and Wales from the beach at Aust, Gloucestershire. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/the-severn-bridge-over-the-river-severn-between-england-and-wales-from-the-beach-at-aust-gloucestershire-image185992920.html
RMMPGKT8–The Severn Bridge over the River Severn between England and Wales from the beach at Aust, Gloucestershire.
A biker taking part in the annual motorcycle event Hoggin the Bridge that sees large numbers of bikes cross the Severn Bridge into Wales. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/a-biker-taking-part-in-the-annual-motorcycle-event-hoggin-the-bridge-that-sees-large-numbers-of-bikes-cross-the-severn-bridge-into-wales-image387202425.html
RM2DDXGJ1–A biker taking part in the annual motorcycle event Hoggin the Bridge that sees large numbers of bikes cross the Severn Bridge into Wales.
Severn Bridge, M48, Aust, South Gloucestershire, 11/11/1987. A Laing worker standing on a platform at the top of the Aust tower of the Severn Bridge while shielding his eyes from the sun. The original design and construction of the Severn Bridge had under estimated the increased volume of traffic since its completion in 1966 and whilst built to last 120 years it was found to require remedial work after just 20. Laing Industrial Engineering & Construction won the £29.5m contract from the Department of Transport and strengthening work on all elements of the structure began in May 1987. Stock Photohttps://www.alamy.com/image-license-details/?v=1https://www.alamy.com/severn-bridge-m48-aust-south-gloucestershire-11111987-a-laing-worker-standing-on-a-platform-at-the-top-of-the-aust-tower-of-the-severn-bridge-while-shielding-his-eyes-from-the-sun-the-original-design-and-construction-of-the-severn-bridge-had-under-estimated-the-increased-volume-of-traffic-since-its-completion-in-1966-and-whilst-built-to-last-120-years-it-was-found-to-require-remedial-work-after-just-20-laing-industrial-engineering-amp-construction-won-the-xa3295m-contract-from-the-department-of-transport-and-strengthening-work-on-all-elements-of-the-structure-began-in-may-1987-image462502297.html
RM2HTCPB5–Severn Bridge, M48, Aust, South Gloucestershire, 11/11/1987. A Laing worker standing on a platform at the top of the Aust tower of the Severn Bridge while shielding his eyes from the sun. The original design and construction of the Severn Bridge had under estimated the increased volume of traffic since its completion in 1966 and whilst built to last 120 years it was found to require remedial work after just 20. Laing Industrial Engineering & Construction won the £29.5m contract from the Department of Transport and strengthening work on all elements of the structure began in May 1987.