Tantangara Dam, Kosciuszko National Park New South Wales, Australia, 21tst July 2024; Aerial view of the Snowy 2.0 construction site at Tantangara dam, showing a light covering of snow and the tunnel entrance for the pumped hydro scheme. Progress of the tunnel boring machine has been reported to have been delayed as a result of unstable geological formations. Credit PjHickox/Live News Alamy
RMID:Image ID:2XK3YDY
Image details
Contributor:
P.j.Hickox / Alamy Stock PhotoImage ID:
2XK3YDYFile size:
68.7 MB (4.2 MB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
6000 x 4000 px | 50.8 x 33.9 cm | 20 x 13.3 inches | 300dpiDate taken:
21 July 2024Location:
Tantangara Dam NSW AustraliaMore information:
This image could have imperfections as it’s either historical or reportage.