Tantangara Dam, Kosciuszko National Park New South Wales, Australia, 21tst July 2024; Aerial view of the Snowy 2.0 construction site at Tantangara dam, showing a light covering of snow and the tunnel entrance for the pumped hydro scheme. Progress of the tunnel boring machine has been reported to have been delayed as a result of unstable geological formations. Credit PjHickox/Live News Alamy

Tantangara Dam, Kosciuszko National Park New South Wales, Australia, 21tst July 2024; Aerial view of the Snowy 2.0 construction site at Tantangara dam, showing a light covering of snow and the tunnel entrance for the pumped hydro scheme. Progress of the tunnel boring machine has been reported  to have been delayed as a result of unstable geological formations. Credit PjHickox/Live News Alamy Stock Photo
Preview

Image details

Contributor:

P.j.Hickox / Alamy Stock Photo

Image ID:

2XK3YDY

File size:

68.7 MB (4.2 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

6000 x 4000 px | 50.8 x 33.9 cm | 20 x 13.3 inches | 300dpi

Date taken:

21 July 2024

Location:

Tantangara Dam NSW Australia

More information:

This image could have imperfections as it’s either historical or reportage.

Available for Editorial use only.