The Ceclavin´s photovoltaic plant built and managed by Iberdrola with 850000 modules and the final power will be 328MW.The Spanish Government announced an investigation against the energetic company, Iberdrola, due to the sudden emptying of two hydroelectric reservoirs: Ricobayo (Zamora) and Valdecañas (Cáceres), during the peak of the price of the energy production. Iberdrola shot up hydroelectric energy production by 37.9% during the first half of the year. Now there is a third possible case under investigation, the Spanish second biggest hydroelectric reservoir of Alcántara (Cáceres), which
Image details
Contributor:
Sipa USA / Alamy Stock PhotoImage ID:
2GM0HKPFile size:
23.4 MB (1.5 MB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
3500 x 2336 px | 29.6 x 19.8 cm | 11.7 x 7.8 inches | 300dpiDate taken:
15 September 2021Photographer:
Sipa USAMore information:
This image could have imperfections as it’s either historical or reportage.
The Ceclavin´s photovoltaic plant built and managed by Iberdrola with 850000 modules and the final power will be 328MW.The Spanish Government announced an investigation against the energetic company, Iberdrola, due to the sudden emptying of two hydroelectric reservoirs: Ricobayo (Zamora) and Valdecañas (Cáceres), during the peak of the price of the energy production. Iberdrola shot up hydroelectric energy production by 37.9% during the first half of the year. Now there is a third possible case under investigation, the Spanish second biggest hydroelectric reservoir of Alcántara (Cáceres), which shows one of the lowest levels in its history. (Photo by Gustavo Valiente / SOPA Images/Sipa USA)