The first new generation 21 …BB Cityjets are to be deployed in Vorarlberg starting in 2019. Tirol also follows suit with 25 …BB Cityjets TALENT 3 ordered in July 2018, the first of which scheduled to be on rails starting in 2020. All vehicles in Austria and Germany will receive unrestricted registration, with six of the 25 vehicles in Tyrol also being registered in Italy so that cross-border traffic to South Tyrol will be possible without changing trains at the Brenner Pass. The first finished train is showcased together with the manufacturer Bombardier Transportation at InnoTrans Ð the intern
Image details
Contributor:
Kai Michael Neuhold / Alamy Stock PhotoImage ID:
PNJY2HFile size:
49.9 MB (3.5 MB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
5116 x 3411 px | 43.3 x 28.9 cm | 17.1 x 11.4 inches | 300dpiDate taken:
20 September 2018Location:
Hennigsdorf, DeutschlandMore information:
This image could have imperfections as it’s either historical or reportage.
The first new generation 21 ÖBB Cityjets are to be deployed in Vorarlberg starting in 2019. Tirol also follows suit with 25 ÖBB Cityjets TALENT 3 ordered in July 2018, the first of which scheduled to be on rails starting in 2020. All vehicles in Austria and Germany will receive unrestricted registration, with six of the 25 vehicles in Tyrol also being registered in Italy so that cross-border traffic to South Tyrol will be possible without changing trains at the Brenner Pass. The first finished train is showcased together with the manufacturer Bombardier Transportation at InnoTrans Ð the international trade fair for rail and transport technology.