Vientiane, Laos. 28th Sep, 2020. Workers are busy at the construction site of the Xiang Ngeun No. 3 Tunnel in Luang Prabang Province, Laos, Sept. 28, 2020. Xiang Ngeun No. 3 Tunnel, the last tunnel along the China-Laos Railway, was drilled through on Tuesday. So far, all the 75 tunnels across the China-Laos Railway have been holed. The successful completion of the tunnels indicates that the controlling factors affecting the China-Laos railway project have basically been removed. Credit: Kaikeo Saiyasane/Xinhua/Alamy Live News
RMID:Image ID:2CWB5X4
Image details
Contributor:
Xinhua / Alamy Stock PhotoImage ID:
2CWB5X4File size:
14.3 MB (737.4 KB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
2736 x 1824 px | 23.2 x 15.4 cm | 9.1 x 6.1 inches | 300dpiDate taken:
28 September 2020Photographer:
XinhuaMore information:
This image could have imperfections as it’s either historical or reportage.