Chelsea and Westminster Hospital, Fulham Road, Kensington and Chelsea, London, 25/09/1990. The last piece of steel for the structural frame of Chelsea and Westminster Hospital being lifted into position by crane. Laing Management Contracting worked on the construction of Chelsea and Westminster Hospital on behalf of the North West Thames Regional Health Authority between 1989 and 1993. The new teaching hospital was built on the site of the old St Stephen’s Hospital, which was demolished in the early months of 1989. The use of fast track construction techniques enabled the entire project

Chelsea and Westminster Hospital, Fulham Road, Kensington and Chelsea, London, 25/09/1990. The last piece of steel for the structural frame of Chelsea and Westminster Hospital being lifted into position by crane. Laing Management Contracting worked on the construction of Chelsea and Westminster Hospital on behalf of the North West Thames Regional Health Authority between 1989 and 1993. The new teaching hospital was built on the site of the old St Stephen’s Hospital, which was demolished in the early months of 1989. The use of fast track construction techniques enabled the entire project Stock Photo
Preview

Image details

Contributor:

Heritage Image Partnership Ltd  / Alamy Stock Photo

Image ID:

2HFK3GD

File size:

77.8 MB (4.1 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

5199 x 5230 px | 44 x 44.3 cm | 17.3 x 17.4 inches | 300dpi

More information:

This image could have imperfections as it’s either historical or reportage.

Chelsea and Westminster Hospital, Fulham Road, Kensington and Chelsea, London, 25/09/1990. The last piece of steel for the structural frame of Chelsea and Westminster Hospital being lifted into position by crane. Laing Management Contracting worked on the construction of Chelsea and Westminster Hospital on behalf of the North West Thames Regional Health Authority between 1989 and 1993. The new teaching hospital was built on the site of the old St Stephen’s Hospital, which was demolished in the early months of 1989. The use of fast track construction techniques enabled the entire project to be completed in less than 5 years. The hospital was officially opened by the Queen on 13 May 1993.