December 20, 2006 ,  San Diego,-Work is underway on the San Diego River section in Lakeside as part of a $16 million plan to restore natural habitat and make a river park. CDC inmate JAIME ORDONEZ planted a native plant in the area where a large constriction in the river was removed and is being cle

December 20, 2006 ,  San Diego,-Work is underway on the San Diego River section in Lakeside as part of a $16 million plan to restore natural habitat and make a river park. CDC inmate JAIME ORDONEZ planted a native plant in the area where a large constriction in the river was removed and is being cle Stock Photo
Preview

Image details

Contributor:

ZUMA Press, Inc. / Alamy Stock Photo

Image ID:

CFTA95

File size:

23.4 MB (981.4 KB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

3504 x 2336 px | 29.7 x 19.8 cm | 11.7 x 7.8 inches | 300dpi

Date taken:

21 December 2006

Photographer:

ZUMA

More information:

This image could have imperfections as it’s either historical or reportage.

December 20, 2006 ,  San Diego, -Work is underway on the San Diego River section in Lakeside as part of a $16 million plan to restore natural habitat and make a river park. CDC inmate JAIME ORDONEZ planted a native plant in the area where a large constriction in the river was removed and is being cleaned out and replanted. Mandatory Credit: Photo by John Gibbins/San Diego Union-Tribune/Zuma Press copyright 2006 San Diego Union-Tribune

Available for Editorial use only.

Search stock photos by tags